EDP Ericeira Pro 2026: project description
The submitted project states 6–12 October 2026 at Ribeira d’Ilhas and a conditions-dependent waiting window. It does not confirm daily heats, visitor admission, shuttles or final operating arrangements.
Checked 2026-10-08 · change risk high
Open DGRM / event project submission
Ericeira, Surfing Reserve
Destination context, reserve overview, Lisbon-distance context and official visitor framing.
Checked 2026-09-07 · change risk medium
Open Turismo de Portugal
Ericeira World Surfing Reserve
Reserve boundaries, designation date and the seven named waves between Empa and São Lourenço.
Checked 2026-10-02 · change risk medium
Open Câmara Municipal de Mafra
Mafra municipality beaches
Official municipal beach list, north to south from Calada to São Julião, and durable descriptions; it is not a live source for flags, water quality or sea conditions.
Checked 2026-10-11 · change risk high
Open Câmara Municipal de Mafra
Praia da Foz do Lizandro
Foz do Lizandro location, setting and municipal beach details.
Checked 2026-10-02 · change risk medium
Open Câmara Municipal de Mafra
Praia de Ribeira d'Ilhas
Ribeira d'Ilhas setting and municipal beach details.
Checked 2026-10-02 · change risk medium
Open Câmara Municipal de Mafra
Praia dos Pescadores
Central town-beach context and municipal information.
Checked 2026-10-02 · change risk medium
Open Câmara Municipal de Mafra
Ericeira World Surfing Reserve guide
The municipality's static 2020 reserve map, historical break characteristics and responsible surf context; never a live conditions or safety report.
Checked 2026-09-07 · change risk low
Open Câmara Municipal de Mafra
Mafra bathing season 2026
The 2026 bathing season ran from 13 June to 13 September with lifeguards from 9:00 to 19:00; outside it no beach has fixed lifeguards, and posted flags and on-site instructions still control the live decision.
Checked 2026-10-11 · change risk high
Open Câmara Municipal de Mafra
APA InfoÁgua
Current official bathing-water quality information and alerts; it does not replace flags, lifeguards or an on-site safety assessment.
Checked 2026-10-08 · change risk high
Open Agência Portuguesa do Ambiente
IPMA Ericeira coastal forecast
Current official coastal forecast for wave, wind and water temperature; a forecast is not a safety clearance.
Checked 2026-10-08 · change risk high
Open Instituto Português do Mar e da Atmosfera
Carris Metropolitana line 2801
Lisboa Campo Grande to the Ericeira bus terminal via A21/A8: the quickest line, about 44 minutes, running mainly on weekdays.
Checked 2026-10-11 · change risk high
Open Carris Metropolitana
Carris Metropolitana line 2803
Current route, stop and schedule checks for the Lisbon–Ericeira connection.
Checked 2026-10-08 · change risk high
Open Carris Metropolitana
Carris Metropolitana line 2740
Current Ericeira–Lisbon route, stop and planned or real-time schedule checks.
Checked 2026-10-08 · change risk high
Open Carris Metropolitana
Carris Metropolitana line 2751
Current Ericeira–Lisbon route, stop and planned or real-time schedule checks.
Checked 2026-10-08 · change risk high
Open Carris Metropolitana
Christmas traditions in Portugal
National festive context only; not evidence that a specific Ericeira business or municipal event will operate.
Checked 2026-09-07 · change risk medium
Open Turismo de Portugal
Mafra: Natal na Vila 2025
Evidence of the municipality's previous 2025 Ericeira programme and the official publisher to monitor; its dates must not be presented as the 2026 programme.
Checked 2026-10-08 · change risk high
Open Câmara Municipal de Mafra
Mafra: Ericeira intermodal bus terminal
The Parque Intermodal da Ericeira beside the A21 access, where buses now stop instead of the former central bus station.
Checked 2026-10-02 · change risk low
Open Câmara Municipal de Mafra
Mafra: Ericeira tourist office and Surf Reserve interpretation centre
Praça da República in the heart of town, used as the reference point for distances to the bus terminal and Ribeira d'Ilhas.
Checked 2026-10-02 · change risk low
Open Câmara Municipal de Mafra
Praia do Sul (Baleia)
Praia do Sul as a sheltered family beach within easy walking distance of the centre.
Checked 2026-10-02 · change risk medium
Open Câmara Municipal de Mafra
Carris Metropolitana line 2126
The Ericeira circular via Ribamar: the bus terminal, town stops and the Ribeira d'Ilhas stop, with loop counts from the current timetable.
Checked 2026-10-08 · change risk high
Open Carris Metropolitana
Cascais harbour master: notices
Every Mafra cliff-access ban on the list, each in force until a lifting notice: 28/2026 (Ribeira d'Ilhas, since 7 May 2026), 12/2026 (São Sebastião, 4 March 2026), 02/2026 (São Lourenço, 27 January 2026) and 31/2025 (Praia da Calada). The only Mafra lifting notice listed is 44/2026 (Praia do Sul); notice 27/2026 (Praia do Algodio cliff works) is no longer listed and no lifting notice is listed.
Checked 2026-10-11 · change risk high
Open Autoridade Marítima Nacional
APA: Praia do Algodio cliff-stabilisation works
APA's note of 4 May 2026: the Algodio cliff-stabilisation works began that day with a 180-day term and temporary access closures, with the Cascais harbour master and Mafra collaborating. It does not announce the end of the works.
Checked 2026-10-11 · change risk high
Open Agência Portuguesa do Ambiente
World Surf League: EDP Ericeira Pro 2026
Event dates of 6–12 October 2026 at Ribeira d'Ilhas, Challenger Series event 4.
Checked 2026-10-08 · change risk high
Open World Surf League